Bill Ward Showcases ‘Absence Of Corners’ Art Collection In Los Angeles

August 15th 2015, Fathom Gallery, Los Angeles CA: Heavy metal icon and former Black Sabbath drummer Bill Ward has spent the past few years developing a ‘rhythm on canvas’ style of art collection titled ‘Absence Of Corners’. The creation of these pieces of art involve Ward setting up his drum kit in a completely dark room and playing colored drum sticks, his movements and the drumming color patterns captured through open shutter photography and rendered on canvas. The collection made its West Coast debut at Fathom Gallery in downtown Los Angeles last weekend, wherein Ward held three sessions to discuss the art in detail. Metal Assault was in attendance for session #2, at 5 PM on Saturday August 15.
Read More

Bill Ward Art Exhibit – The only Los Angeles appearance – Discussion & Art Show

The exhibition opens on August 15th with two artist discussions by Mr. Ward in which he details the concepts underlining the artwork and relates personal stories of how each piece is connected to his private or professional life. The first lecture starts at 2PM and the second at 5PM. The lectures are free to the public, however attendance to each lecture is available on a first-come basis and pre-registration is required. The Absence of Corners Exhibition is a special limited engagement and only hangs at FATHOM, Los Angeles through August 29th. RSVP: BillWardDrumArt.com