Chris Fehn, Slipknot no. 3: Through The Darkness (OFFICIAL TRAILER)


Slipknot’s #3 (Chris Fehn) goes from drum to canvas with a collection of artwork built from rhythm and fused with hidden imagery to uncover with each viewing. The collection, titled Through the Light, is highly limited in availability with each piece numbered and individually signed by Chris Fehn. Those interested in learning more about the art and seeing the collection before the release are encouraged to join the interest list at www.chrisfehnart.com.