Monthly Archives: October 2015

Carl Palmer releases ART IN RHYTHM: The Artwork of Carl Palmer

THE FIRST EDITION
A Comprehensive Book on
Carl Palmer’s artwork is unveiled

A HIGHLY LIMITED RELEASE
Just 250 books available in the First Edition,
all are numbered and individually signed

 


INCLUDES AN ART PIECE BY PALMER

Each of the 250 books in the First Edition feature
an art piece by Palmer titled “Art in Rhythm”

 


A CAREER FIRST FOR CARL
Co-Authored by Palmer, this is the debut art
book of his rhythm-on-canvas works.



THE COLLECTIONS DISCUSSED
A year in the making, the book touches upon each work in
the Twist of the Wrist and The Rhythm of Light collections, as well as Palmer’s
journey with bringing rhythm to a visual over more than four decades.



ALL BOOKS ARE SIGNED AND NUMBERED
In the First Edition, all of the books in the edition are numbered and
individually signed by Carl Palmer.
This is the second published release by SceneFour, Inc.
http://www.scenefour.com