Iconic Drummer Steve Smith Debuts Fine Art Collection “The Fabric of Rhythm” (OFFICIAL TRAILER)

On May 15, 2013, iconic drummer of Vital Information and formerly of Journey, Steve Smith unveils a fine art collection created from drum performance called The Fabric of Rhythm. Highly limited in availability a total of 100 are available. To get on the interest for the opportunity to see the collection before the debut, sign up at www.stevesmithdrumart.com.