Steven Adler’s “Out Ta Get Me: A Visual Study of Rhythm” Limited Edition


Done in conjunction with the drummer’s 50th birthday, Steven Adler built the collection over the course of 12 months in Los Angeles with art team SceneFour. The artwork featured in “50” focuses on Adler’s most acclaimed rhythms, bringing them from sound to sight.