Artists

ARTIST COLLECTION AVAILABILTY SITE
Rick Allen

 

Electric Hand:
Rythm & Change
Shape Shifter
Electric Bird/The Raven – Sold Out
Divine Mother – Sold Out
Wild Horse Spirit – Sold Out
Dragon Head
Head Dress
Angel Holding Sun – Sold Out
Kachina
Templar – Sold Out
Warrior Heart – Sold Out
Journey – Sold Out
www.rickallenart.com
Stephen Perkins TIME Springtime
Perfect Time
Odd Time
Bed Time
All In Time
Just In Time
Night Time
Out Of Time
Summertime
A Moment In Time…
www.theartofstephenperkins.com
Matt Sorum 100 Canvases of Epic Rhythm Cleopetria
Hearts of Ghosts
My Skull, My Strength
Stone Fish
To Sail with Jesus
www.mattsorumart.com
Frankie “Kash” Waddy 100 Canvases of Epic Rhythm Beamin’ Up
Beat Vibes
Never Look Down
Sublime Reality
Through My Eyes
Cosmic Circumstance
Quiet Fire
www.frankiekash.com

Recent Posts

  1. Rick Allen Interview w/ Fox 5 (Las Vegas) About Art Exhibit Leave a reply
  2. Las Vegas Sun – Art rock: Martin Lawrence Galleries to debut exhibit by Def Leppard drummer Rick Allen Leave a reply
  3. Rick Allen’s Art Debut at Martin Lawrence Galleries (Las Vegas) – March 22-April 10, 2013 Leave a reply
  4. WHFS: Incubus Drummer Jose Pasillas Makes Rhythm The Medium With New Art Installation Leave a reply
  5. Drummer Cafe Leave a reply
  6. KROQ Leave a reply
  7. ‘Art Of Drums’: capturing percussion on canvas Matt Sorum, Stephen Perkins, Frankie Waddy participating Leave a reply
  8. Velvet Revolver’s Matt Sorum Launches Art Collection Leave a reply
  9. Def Leppard’s Rick Allen Announces The Debut Of Electric Hand: Rhythm + Change Leave a reply