SCENEFOUR: CAN MUSIC BE VISUAL ART?

A COLLABORATIVE PROJECT between some of the greatest drummers in rock history and a visual art team in Los Angeles has captured rhythm on canvas. For decades, the movement and approach of fine artists has been studied and compared to rhythm. Most notably Jackson Pollock's abstract work in the 1950s showcased “rhythmic nature” in relation to his splattering of paint on canvas and the patterns produced.

Featured: Chad Smith (RHCP), Rick Allen (Def Leppard), Carl Palmer (ELP fame), Jose Pasillas (Incubus), Steven Adler (GNR), Dave Lombardo (Slayer), Bill Ward (Black Sabbath), Chad Sexton (311), Terry Bozzio (Zappa) and Mario Duplantier (Gojira).